Strategicorp Inc.
We offer solutions that provide Expert Decision Support
Methodologies to Improve Industrial equipment reliability
AND reduce costs using our business based processes
QUICK LINKS
Customer Success Stories
Customers across asset intensive industries
have already demonstrated that SOS
TM
and
RCM Turbo
TM
deliver measurable, repeatable
improvements in reliability, cost control, and
decision quality. Below are featured
organisations where these methodologies
helped them cut unplanned downtime,
streamline maintenance workloads, and
strengthen the consistency of engineering
decisions. By applying structured, business
based processes rather than intuition or
legacy habits, teams have been able to
prioritise the right work, eliminate low value
tasks, and build a more resilient
maintenance culture.
Aluminium Bahrain
•
Dedicated implementation of RCM
Turbo
over a three month period
•
Completed assessment of 75% of plant
•
Outcomes included 40% reduction in
overall maintenance costs
•
Increased plant reliability
Colorado Power
•
One Month pilot on Coal Handling
plant
•
Outcomes included 56% reduction in
planned maintenance costs
•
20 major systems completed in 18
months
•
SOS
use in one power station
resulted in reduction of $ 4million
Delta Electricity
•
SOS
applied to manufacturers’ spares
lists worth $900,000 (dry ash plant)
•
Optimised list using SOS
less than
$90,000
Detroit Edison
•
Fermi 2 Nuclear Plant - reduced spares
inventory by $15million
•
$9.5 million directly attributable to SOS
Hydro Quebec
•
SOS
applied to spares lists for new
high voltage transmission equipment
•
Immediate saving - $795,000
•
Total list $2.2million
Lemington Coal
•
Value of spares assessed using SOS
-
$2.2 million
•
2,119 items assessed
•
Value of net reductions $ 504,000
•
22.9% reduction while optimising
Rohm & Haas
•
SOS
project in one salt mine resulted
in spares reduction while optimizing in
excess of $US600,000
Moura Mine
•
RCM Turbo
applied to Coal Handling
Plant
•
Outcomes included annualised
benefits totalling $1.5million
•
New equipment designs
•
Removal of ineffective maintenance
tasks
Newcrest Telfer Mine
•
SOS
applied to manufacturers’ spares
lists during RCM Turbo
implementation
•
Immediate benefits, one site, one list
over $94,000
NZ Aluminium Smelters
•
SOS
applied to spares list for new pot
line
•
Immediate benefit - $700,000 savings on
list worth $1.4million
Pacificorp Generation
•
Used SOS
to reduce generation spares
from $68million to $54million
•
$14million benefit
Portland Aluminium
•
SOS
directly responsible for spares
optimisations valued at $1million
•
Original value $5.7million total
reduction 33%
Proton Malaysia
•
Value of spares assessed using SOS
$1.98million
•
Optimised reductions $807,000
•
40% improvement
Pt. Waratah Coal
•
Applied RCM Turbo
to their conveying
systems as part of a pilot
•
Implemented outcomes immediately
•
After 12 months, achieved virtual
elimination of breakdowns
Queensland Nickel
•
SOS
used for optimisation of fast moving
items - Min/Max levels
•
Slow moving items - cost/risk assessment
•
Redundant items identified
•
55.7% of stock optimised for 10.8%
identified reduction in store $ value.
Queensland Nitrates
•
When a greenfield site - new spares lists
totalled $2.49million
•
SOS
optimized lists valued at $ 1.25
million
•
Saving $ 1.24 million
•
Acquired RCM Turbo
in 2018
Snowy Mountains Hydro
•
Using RCM Turbo
reduced routine
planned maintenance costs by 30%
•
Reduction in maintenance costs for
generation assets - 25%
•
Increased generation availability
•
Initial exercise at Murray 2 Station - eight
months duration
St Ives Gold Mine
•
SOS
applied to manufacturers’ spares
lists
•
Immediate benefits, one site, one list
over $120,000
Tampa Electric
•
SOS
applied to 450 items over $100
•
Total value of these $ 434,000
•
Net reduction $ 217,245
•
50% reduction after increases of $7,300
Tarong Coal
•
RCM Turbo
applied to dragline
•
Outcomes included reduction of 4000
hours in maintenance manhours
•
Direct labor cost savings $350,000
•
SOS
applied to dragline spares
•
Outcome - reduction in total spares
inventory of $1,500,000
•
Annual improvement $450,000
•
Indirect additional savings $ 250,000
Tarong Energy
•
World record continuous operation of
Generation Unit 2 - during 2001
•
RCM Turbo
recognised in Tarong
Energy’s Annual Report
Tennessee Valley
Authority
•
Using SOS
as part of a five year plan to
reduce overall spares by $100 million
•
At the beginning of year 5, accumulated
reductions exceeded $94 million
Tioxide Malaysia
•
Results from pilot - 223 items assessed
using SOS
•
Value of spares assessed - R3,226,000
•
Value of spares reductions - R 617,000
•
19% reduction
Water Corporation WA
•
Statewide implementation of RCM
Turbo
•
Quantified benefits exceeding $2
million
•
Special case of Kununurra Dam -
improvements worth $700,000 in that
one site alone
Weyerhaeuser Timber
•
Established standard interval for review
of MTBF’s and revisions of PM
inspections.
•
Increased maintenance uptime from
85% to 98% consistently.
•
Increased utilization from 60% to 82%
consistently.
•
Reduced maintenance overtime from
20% to 11% consistently.